December 09, 2008 KR2 update

Back to work on the plane after a month out of the area..  Not much to photograph.  I completed the wiring to the ignition coils, starter, and ignition key.  The  exhaust system was installed, and the EGT and cylinder head temp probes wired.  The power solenoid attached to the positive power bus.

Wiring on right side. Coils. O2 sensor, thermocouples

Left side. Thermocouples. O2 sensor. Wiring not secured yet.

Prop back on to re-torque safety shaft.