December 09, 2008 KR2 update
Back to work on the plane after a month out of the area.. Not much to photograph. I completed the wiring to the ignition coils, starter, and ignition key. The exhaust system was installed, and the EGT and cylinder head temp probes wired. The power solenoid attached to the positive power bus.