January 31, 2009 KR2 update
Not much to photograph. I have wired in and tested the flap switch, the Master switch, the landing light, and power to the ignition switch. I can properly switch between coil 1 and coil 2. The amp meter shunt is installed, and the positive buss bar has a master relay attached. The EIS has been sent in for an upgrade to include altitude and airspeed.
|
|
|
|
||||
|
|
|
|
||||
|
|
|
||||||